Baseball Field

TCHS baseball field has seen many improvements over the last several years.  The first renovation was the addition of the baseball locker room and maintenance storage built onto the 3rd base home dugout.  In 2018, the old wire backstop and fencing was removed and replaced with mesh netting and a brick knee wall backstop.  In the same summer, the field had extensive drainage work and new sod laid in the outfield.  An infield tarp was also added to help prevent rainouts. Lastly in the summer of 2019, red rock was added to the warning track areas from dugout to dugout and behind home plate.